J-K highway restored after seven-hour long road clearance operation
Over 1,000 passenger vehicles and 1,500 trucks were left stranded on the 270-km highway, the only all-weather road linking Kashmir with the rest of the country, after a landslide blocked the arterial road at Digdol around 11 am, the officials said. (Representative Image)
Over 1,000 passenger vehicles and 1,500 trucks were left stranded on the 270-km highway, the only all-weather road linking Kashmir with the rest of the country, after a landslide blocked the arterial road at Digdol around 11 am, the officials said. (Representative Image)
Comments Close